Transforming Transport Infrastructure With
Digital Twins
With SpatialSense Scanner and Cloud, optimise infrastructure management to boost efficiency, save costs, and minimise downtime.
Transforming Transport Infrastructure With
Digital Twins
With SpatialSense Scanner and Cloud, optimise infrastructure management to boost efficiency, save costs, and minimise downtime.
Transforming Transport Infrastructure With
Digital Twins
With SpatialSense Scanner and Cloud, optimise infrastructure management to boost efficiency, save costs, and minimise downtime.
Transforming Transport Infrastructure With
Digital Twins
With SpatialSense Scanner and Cloud, optimise infrastructure management to boost efficiency, save costs, and minimise downtime.
Trusted By
OUR PRODUCTS
Precision Redefined for
Every Application
SS-128
Spatial Sense Scanner
SE-64
Spatial Sense Edge Device
On-the-go Processing Even in Harsh Environments
UPCOMING EVENTS & EXHIBITIONS
Find Us At Your Nearest Exhibition
Kodifly is Coming at
AUSRAIL 2024
Date 25 - 27 Nov
Booth No.223
Gold Coast Convention & Exhibition Centre
Kodifly is Coming at
AUSRAIL 2024
Date 25 - 27 Nov
Booth No.223
Gold Coast Convention & Exhibition Centre
OUR PRODUCTS
Precision Redefined for
Every Application
SS-128
Spatial Sense Scanner
Enhanced 3D Color Models for Improved Infrastructure Management
Spatial Sense Cloud
Real-time Insights from Scanners and Edge Devices
UPCOMING EVENTS & EXHIBITIONS
Find Us At Your Nearest Exhibition
Kodifly is Coming at
AUSRAIL 2024
Date 25 - 27 Nov
Booth No.223
Gold Coast Convention & Exhibition Centre
HOW KODIFLY EMPOWERS THE FUTURE?
Kodifly Empowers the Future of Transportation with Advanced Digital Twin Technology.
Highway
Advancing road safety and traffic flow with innovative monitoring and predictive analytics, optimizing highway operations and travel safety.
Railway
Empowering rail operations with AI and spatial analytics for safety enhancements and efficient management, including vegetation control and integrity monitoring.
Construction
Transforming construction processes with digital twins, precise site surveillance, and asset management to streamline projects and ensure compliance.
HOW DIGITAL TWIN WORKS?
Harnessing LiDAR for Real-Time Visualization and 3D Point Cloud View.
HOW WE GATHER THE SPATIAL TWIN DATA?
Unlocking the Value of Spatial Digital Twins
Digital Twin Creation
Utilizes precise LiDAR scanning for accurate railway infrastructure 3D modeling.
AI-Powered Insights
Processes 3D data with AI for crucial inspection and safety insights.
Efficient Asset Management
Combines digital twins and AI for improved railway asset safety and efficiency.
Predictive Maintenance
AI detects early signs of issues, allowing timely, economical fixes.
Meet Spatial Sense Platform
Leverage our platform's powerful analytics to unlock actionable insights and drive informed decisions across your infrastructure network.
Digital Twin of Infrastructure
Create a comprehensive digital repository of your infrastructure assets, streamlined for easy access and management.
3D Point Cloud Analytics
Harness the precision of 3D point cloud analytics to visualize and analyze the spatial dynamics of your assets with unmatched detail.
Actionable Insights on Asset Health
Gain critical insights into the health of your assets, with data-driven intelligence that informs maintenance and operational strategies.
Maintenance Reports
Effortlessly generate and export detailed maintenance reports, ensuring that actionable information is readily available for on-the-ground teams.
OUR PRODUCTS
Precision Redefined for
Every Application
SS-128
Spatial Sense Scanner
Enhanced 3D Color Models for Improved Infrastructure Management
SE-64
Spatial Sense Edge Device
On-the-go Processing Even in Harsh Environments
UPCOMING EVENTS & EXHIBITIONS
Find Us At Your Nearest Exhibition To Discuss Our Ideas!
Kodifly is Coming at
AUSRAIL 2024
Date 25 - 27 Nov
Booth No.223
Gold Coast Convention & Exhibition Centre
APPLICATION SECTORS
APPLICATION SECTORS
Enhancing Railway, Highway, and Airport infrastructure management with LiDAR and Cloud Analytics
Highway
Advancing road safety and traffic flow with innovative monitoring and predictive analytics, optimizing highway operations and travel safety.
Railway
Empowering rail operations with AI and spatial analytics for safety enhancements and efficient management, including vegetation control and integrity monitoring.
Construction
Transforming construction processes with digital twins, precise site surveillance, and asset management to streamline projects and ensure compliance.
Highway
Advancing road safety and traffic flow with innovative monitoring and predictive analytics, optimizing highway operations and travel safety.
Railway
Empowering rail operations with AI and spatial analytics for safety enhancements and efficient management, including vegetation control and integrity monitoring.
Construction
Transforming construction processes with digital twins, precise site surveillance, and asset management to streamline projects and ensure compliance.
SEE IT IN ACTION
Harnessing LiDAR for Real-Time Actionable Insights
Harnessing LiDAR for Real-Time Actionable Insights
BENEFITS
Unlocking the Value of Spatial Digital Twins
Unlocking the Value of Spatial Digital Twins
We gather comprehensive spatial data from transport infrastructures and deliver actionable insights and advanced processing tools for every team in your organization.
We gather comprehensive spatial data from transport infrastructures and deliver actionable insights and advanced processing tools for every team in your organization.
Lower
80%
Cost of Inspection
Lower
34%
Risk of accident
Higher
45%
Operational Efficiency
Digital Twin Creation
Digitally replicate your infrastructure for real-time monitoring and simulation, enhancing understanding and preparedness.
AI-Powered Insights
Transform raw data into strategic knowledge with our AI algorithms, fine-tuning your operational decisions.
Efficient Asset Management
Streamline your asset oversight and optimization with our integrated platform, driving productivity and cost savings.
Predictive Maintenance
Anticipate maintenance needs and prevent downtime with predictive analytics, keeping your operations ahead of the curve.
Digital Twin Creation
Utilizes precise LiDAR scanning for accurate railway infrastructure 3D modeling.
AI-Powered Insights
Processes 3D data with AI for crucial
inspection and safety insights.
Efficient Asset Management
Combines digital twins and AI for improved railway asset safety and efficiency.
Predictive Maintenance
AI detects early signs of issues, allowing timely, economical fixes.
Meet SpatialSense Platform
Meet SpatialSense Platform
Leverage our platform's powerful analytics to unlock actionable insights and drive informed decisions across your infrastructure network.
Leverage our platform's powerful analytics to unlock actionable insights and drive informed decisions across your infrastructure network.
Digital Twin of Infrastructure
Create a comprehensive digital repository of your infrastructure assets, streamlined for easy access and management.
Create a comprehensive digital repository of your infrastructure assets, streamlined for easy access and management.
3D Point Cloud Analytics
3D Point Cloud Analytics
Harness the precision of 3D point cloud analytics to visualize and analyze the spatial dynamics of your assets with unmatched detail.
Harness the precision of 3D point cloud analytics to visualize and analyze the spatial dynamics of your assets with unmatched detail.
Actionable Insights on Asset Health
Actionable Insights on Asset Health
Gain critical insights into the health of your assets, with data-driven intelligence that informs maintenance and operational strategies.
Gain critical insights into the health of your assets, with data-driven intelligence that informs maintenance and operational strategies.
Maintenance Reports
Maintenance Reports
Effortlessly generate and export detailed maintenance reports, ensuring that actionable information is readily available for on-the-ground teams.
Effortlessly generate and export detailed maintenance reports, ensuring that actionable information is readily available for on-the-ground teams.
We're hiring!
Become a part of a fast growing startup and reshape the future of spatial analytics with Kodifly.
We're hiring!
Become a part of a fast growing startup and reshape the future of spatial analytics with Kodifly.
REAL WORLD APPLICATIONS
Innovative Infrastructure Solutions for Railways, Highways, and Airports.
Railway Vegetation Monitoring
Unmanaged vegetation along railways poses risks to safety and can cause costly disruptions to service.
Kodifly employs LiDAR and AI analytics for precise detection and mapping of foliage encroachment, automating vegetation management.
Rail operators experience enhanced safety, reduced service interruptions, and lower maintenance costs with proactive vegetation control.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyLocomotive Perception System
Locomotive drivers face significant challenges during night-time rail maintenance, where low visibility increases the risk of collisions and track incidents.
Locomotive Perception System leverages 3D and 2D detection technologies to identify and classify critical objects and hazards, providing essential safety data directly to the driver's cabin interface.
Teams benefit from enhanced driver assistance and reduced track incidents, even in low-visibility scenarios.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at CompanyBlind Spot Detection System
Light rail vehicles at crossings face blind spots that obscure pedestrians, posing serious safety risks.
Kodifly installs front-facing camera systems to eliminate blind spots, ensuring clear visibility of the track ahead.
This system enhances safety by detecting pedestrians in front of the vehicle, crucial for preventing accidents.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyVehicle Counting & Classification in Road Tunnels
Managing tunnel traffic flow efficiently while ensuring safety poses significant challenges due to limited visibility and space.
Our Tunnel Traffic Monitoring System leverages AI, LiDAR, and video analytics to accurately count and classify vehicles in real-time at tunnel entrances.
Operators gain valuable insights to optimize traffic flow, enhancing tunnel safety and efficiency.
Railway Mapping System
Kodifly's rail mapping solution offers a comprehensive approach to railway infrastructure management. This advanced system, equipped with LiDAR, cameras, GNSS, and IMU sensors, excels in mapping and analyzing railway tunnels and corridors, a traditionally challenging aspect of rail maintenance. From heavily manual and time-consuming to swift, accurate, and consistent, Kodifly transforms the rail surveying process, enabling organisations to have reliable information about it's infrastructure..
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyRailway Vegetation Monitoring
Unmanaged vegetation along railways poses risks to safety and can cause costly disruptions to service.
Kodifly employs LiDAR and AI analytics for precise detection and mapping of foliage encroachment, automating vegetation management.
Rail operators experience enhanced safety, reduced service interruptions, and lower maintenance costs with proactive vegetation control.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyVehicle Counting & Classification in Road Tunnels
Managing tunnel traffic flow efficiently while ensuring safety poses significant challenges due to limited visibility and space.
Our Tunnel Traffic Monitoring System leverages AI, LiDAR, and video analytics to accurately count and classify vehicles in real-time at tunnel entrances.
Operators gain valuable insights to optimize traffic flow, enhancing tunnel safety and efficiency.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyBlind Spot Detection System
Light rail vehicles at crossings face blind spots that obscure pedestrians, posing serious safety risks.
Kodifly installs front-facing camera systems to eliminate blind spots, ensuring clear visibility of the track ahead.
This system enhances safety by detecting pedestrians in front of the vehicle, crucial for preventing accidents.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyRailway Mapping System
Kodifly's rail mapping solution offers a comprehensive approach to railway infrastructure management. This advanced system, equipped with LiDAR, cameras, GNSS, and IMU sensors, excels in mapping and analyzing railway tunnels and corridors, a traditionally challenging aspect of rail maintenance. From heavily manual and time-consuming to swift, accurate, and consistent, Kodifly transforms the rail surveying process, enabling organisations to have reliable information about it's infrastructure..
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyLocomotive Perception System
Locomotive drivers face significant challenges during night-time rail maintenance, where low visibility increases the risk of collisions and track incidents.
Locomotive Perception System leverages 3D and 2D detection technologies to identify and classify critical objects and hazards, providing essential safety data directly to the driver's cabin interface.
Teams benefit from enhanced driver assistance and reduced track incidents, even in low-visibility scenarios.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyRailway Vegetation Monitoring
Unmanaged vegetation along railways poses risks to safety and can cause costly disruptions to service.
Kodifly employs LiDAR and AI analytics for precise detection and mapping of foliage encroachment, automating vegetation management.
Rail operators experience enhanced safety, reduced service interruptions, and lower maintenance costs with proactive vegetation control.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyVehicle Counting & Classification in Road Tunnels
Managing tunnel traffic flow efficiently while ensuring safety poses significant challenges due to limited visibility and space.
Our Tunnel Traffic Monitoring System leverages AI, LiDAR, and video analytics to accurately count and classify vehicles in real-time at tunnel entrances.
Operators gain valuable insights to optimize traffic flow, enhancing tunnel safety and efficiency.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyBlind Spot Detection System
Light rail vehicles at crossings face blind spots that obscure pedestrians, posing serious safety risks.
Kodifly installs front-facing camera systems to eliminate blind spots, ensuring clear visibility of the track ahead.
This system enhances safety by detecting pedestrians in front of the vehicle, crucial for preventing accidents.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyRailway Mapping System
Kodifly's rail mapping solution offers a comprehensive approach to railway infrastructure management. This advanced system, equipped with LiDAR, cameras, GNSS, and IMU sensors, excels in mapping and analyzing railway tunnels and corridors, a traditionally challenging aspect of rail maintenance. From heavily manual and time-consuming to swift, accurate, and consistent, Kodifly transforms the rail surveying process, enabling organisations to have reliable information about it's infrastructure..
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyLocomotive Perception System
Locomotive drivers face significant challenges during night-time rail maintenance, where low visibility increases the risk of collisions and track incidents.
Locomotive Perception System leverages 3D and 2D detection technologies to identify and classify critical objects and hazards, providing essential safety data directly to the driver's cabin interface.
Teams benefit from enhanced driver assistance and reduced track incidents, even in low-visibility scenarios.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyRailway Vegetation Monitoring
Unmanaged vegetation along railways poses risks to safety and can cause costly disruptions to service.
Kodifly employs LiDAR and AI analytics for precise detection and mapping of foliage encroachment, automating vegetation management.
Rail operators experience enhanced safety, reduced service interruptions, and lower maintenance costs with proactive vegetation control.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyVehicle Counting & Classification in Road Tunnels
Managing tunnel traffic flow efficiently while ensuring safety poses significant challenges due to limited visibility and space.
Our Tunnel Traffic Monitoring System leverages AI, LiDAR, and video analytics to accurately count and classify vehicles in real-time at tunnel entrances.
Operators gain valuable insights to optimize traffic flow, enhancing tunnel safety and efficiency.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp“We have 10x’ed the speed of our engineering team. Having data distilled in such a smart way is just heaven.”
Noah HoltCTO at Company“Because of the flexible pricing plans, we were able to get exactly what we need at a fair price. That was pivotal in the early stages of our company.”
Diana BradyCFO at Company“We can make sound decisions on our marketing campaign with the data our engineering team is generating every week.”
Lian MathewsHead Marketing at CompanyBlind Spot Detection System
Light rail vehicles at crossings face blind spots that obscure pedestrians, posing serious safety risks.
Kodifly installs front-facing camera systems to eliminate blind spots, ensuring clear visibility of the track ahead.
This system enhances safety by detecting pedestrians in front of the vehicle, crucial for preventing accidents.
“As we grow, it becomes increasingly important that we use software that we can trust and know is secure.”
Ellis KochCTO at Acme Corp