Skip to content
Kodifly

DEVB TC(W) No. 8/2025

Digital Works Supervision System (DWSS) for Hong Kong

DWSS stands for Digital Works Supervision System, the system DEVB requires on Hong Kong capital works contracts above HK$30 million tendered from 1 April 2026. Kodifly delivers it complete on SpatialSense, built to Annex A of TC(W) No. 8/2025.

6
of 6 Annex A mandatory modules, live.
99.9%
working-hours uptime, as Annex A requires.
24
hours to open data to iCWP by API.

Everything Annex A asks for, included.

12 of 12 included

  • Request for Inspection (RISC)

  • Site Diary

  • Site Safety Inspection Records

  • Cleansing Inspection Checklists

  • Labour Return (G.F. 527)

  • Contract Management and NEC data

  • Smart Document Management

  • AI assistant for site records

  • 360, drone and LiDAR capture

  • API to iCWP and third parties

  • Web, iOS and Android apps

  • Security, backup and audit trail

One DWSS, every circular connected.

Sample project data

Findings tied to the place they came from.

Pin an issue in the 360 view and assign it. It stays attached to its photo and date, from walk to report.

See how SpatialSense works

Live in three months.

  1. Within one month

    Live demonstration for approval.

  2. Within eight weeks

    Proposal, workflows and interfaces.

  3. Within three months

    DWSS commissioned and running.

Read with these circulars

Guides and detail pages

  • Cleansing inspection

    What the DWSS Cleansing Inspection Checklists module must do under TC(W) No. 8/2025 Annex A: daily and weekly checklists, records, workflow, statistics and SpatialSense.

  • Contract management

    What the DWSS Contract Management module must do under TC(W) No. 8/2025 Annex A: compensation events, early warnings, payment, programme, NEC Health Check data.

  • Glossary

    A sourced glossary of DWSS terms in Hong Kong public works: DWSS, iCWP, DSR, RISC, SCM, SDM, EDMS, SSSS or 4S, CSP, NEC and PTE, with the circular paragraph for each.

  • How to choose

    How to choose a DWSS for Hong Kong public works. Nine criteria from TC(W) No. 8/2025 Annex A, questions to ask any vendor, red flags, and how Kodifly answers each.

  • iCWP data standard

    How a DWSS feeds DEVB's iCWP under TC(W) No. 8/2025. The data standardisation rule, the 24-hour API clause, what data flows and how SpatialSense meets it.

  • Labour Return

    What the DWSS Labour Return module must do under TC(W) No. 8/2025 Annex A: every G.F. 527 field, retrieval from the Site Diary, workflow, statistics and SpatialSense.

  • RISC

    What the DWSS RISC module must do under TC(W) No. 8/2025 Annex A 7.5: form references, fields, workflow and sign-off, dashboard, and how SpatialSense delivers it.

  • Site Diary

    What the DWSS Site Diary module must do under TC(W) No. 8/2025 Annex A 7.5: G.F. 536, Site Record Book, content, workflow, statistics, and how SpatialSense delivers it.

  • Site safety inspection

    What the DWSS Site Safety Inspection Records module must do under TC(W) No. 8/2025 Annex A: safety walks, performance records, workflow, statistics and SpatialSense.

  • TC(W) No. 8/2025

    DEVB TC(W) No. 8/2025 in plain terms. Who must adopt the DWSS, the HK$30 million threshold, 1 April 2026, changes from TC(W) No. 2/2023, cost ceiling, EDMS and audit.

  • Tender checklist

    A clause-by-clause checklist of DEVB TC(W) No. 8/2025 Annex A for DWSS tenders: proposal contents, access, security, backup, availability, timeline, handover and AI.

DWSS questions

What is a DWSS?

A Digital Works Supervision System is the web-based portal DEVB requires on Hong Kong capital works contracts above HK$30 million tendered on or after 1 April 2026. It digitises the mandatory site forms and records (RISC, site diary, safety and cleansing inspections, labour returns and contract management), collects data from smart site applications, and holds the formal project documents (paragraph 9, Annex A 1.1).

Which DWSS is available in Hong Kong?

Kodifly's SpatialSense is a complete DWSS built to Annex A of TC(W) No. 8/2025, with all six mandatory modules, Smart Document Management and AI built in, plus 360, drone and LiDAR capture in the same dated record. The circular sets requirements rather than naming products, so compare any proposal against Annex A.

What are the six mandatory DWSS modules?

Request for Inspection / Survey Check (RISC) with linked history and a status dashboard, Site Diary / Site Record Book, Site Safety Inspection Records, Cleansing Inspection Checklists, Labour Return Record covering every field of G.F. 527, and Contract Management with compensation events, instructions, early warnings, programme, payment and NEC Health Check data (Annex A 7.5).

What changed between TC(W) No. 2/2023 and TC(W) No. 8/2025?

Paragraph 6 lists four key improvements. A Smart Document Management component replaces the separate EDMS. The Contract Management module adds NEC Health Check data. The circular sets project team requirements for managing the DWSS. And contractors adopt AI technologies within the DWSS.

Which contracts must adopt the DWSS?

Capital works contracts, including capital subventions contracts under Head 708, with a pre-tender estimate above HK$30 million and tendered on or after 1 April 2026. Earlier contracts implement the enhancements as far as practicable, and bureaux and departments should adopt it in other works contracts such as maintenance and term contracts.

How soon must a DWSS be running after the contract starts?

Annex A 3.1 asks for a live demonstration within one month of commencement, a proposal within eight weeks and commissioning within three months, or as agreed with the employer's representative.

What must a DWSS proposal include?

Design of forms, records, reports and dashboards, workflow processes and allowable times, interfacing protocols with smart site data systems, platform architecture and network configuration, hosting environment with independent auditor reports where relevant, delivery schedule and user acceptance criteria, backup and disaster recovery, security assurance, and any AI features (Annex A 3.1.2, with 1.5.2 and 2.3.2 for AI and hosting reports).

What does Annex A require on access, security and availability?

A desktop browser over HTTPS with no extra software plus native iOS and Android apps (1.6), at least 256-bit SSL with encryption in transit and at rest (4.1), scheduled and off-site backups (4.2), 99.9% uptime during working hours and a disaster recovery plan (2.4), and data available to third-party applications including iCWP by API within 24 hours (1.7.2).

Do we still need a separate EDMS?

No. Contractors are no longer required to procure a separate Electronic Document Management System, because the Smart Document Management component within the DWSS fulfils those requirements (paragraph 11).

How much should a DWSS cost?

The estimated cost would normally not exceed HK$1.5 million or 1% of the pre-tender estimate, whichever is higher, with a cap of HK$10 million. Exceeding it needs approval from an officer at D2 rank or above. It does not form part of the contract computer facilities estimate (paragraph 12).

Are smart site devices part of the DWSS?

The DWSS is the centralised platform that collects and consolidates smart site data (paragraph 12, footnote 2). Kodifly also delivers the devices and the Smart Site Safety System that feed it, as one project.

What happens at handover and audit?

The DWSS is handed over to the employer at completion, a professional-rank project team member and a resident site staff member manage it, and its proper adoption and use is a standard item in technical audits (paragraphs 15 and 16, Annex A 11.2; project team in 3.2).

What did this circular replace?

TC(W) No. 2/2023, which required a DWSS on capital works contracts above HK$30 million tendered from 1 April 2023.

Walk through your DWSS tender

Send us the contract, estimate and tender date. We will show SpatialSense against your clauses.