Skip to content
Kodifly
EN
Menu

Hardware

A fixed LiDAR eye on the whole site

ScanStation K4DL-1000 mounts on a pole, tower crane or other fixed structure and captures colourised, georeferenced point clouds of your works area over time, so the AI can watch for movement and raise an alert. It is also the 4D LiDAR data DEVB's Co-supervision Platform relies on.

A ScanStation mounted on a pole beside a high-rise under construction at dusk, with a green laser line scanning the building

How it works

It stays put and watches the same ground.

The unit looks at one area again and again. Comparing the scans over time gives the point-cloud video the Co-supervision Platform asks for.

  • Mounted on poles, tower cranes or other fixed structures.
  • Real-time colourised point clouds with centimetre-level georeferencing.
  • IP65 housing for site conditions.
Fixed in placeSame view, every scan
WeatherproofIP65 housing
ScanStation K4DL-1000 fixed-point LiDAR unit: a black weatherproof housing with a LiDAR window, a camera, two antennas and a pan-tilt base

ScanStation K4DL-1000.

Key specifications

Values as published by Kodifly. A full datasheet is available on request.

Model
ScanStation K4DL-1000
Type
Fixed-point LiDAR for construction sites
Range accuracy
±2 cm
Output
Real-time colourised point clouds
Georeferencing
Centimetre-level
Ingress protection
IP65

Where ScanStation fits

Installed on site

Kodifly LiDAR units on tower cranes, poles and public works sites.

  • A Kodifly LiDAR and camera unit on a pan-tilt head, facing a hillside works site
    ScanStation on a pole at a public works site.
  • A Kodifly equipment cabinet being installed on a tower crane at a Hong Kong housing site
    Site unit being installed on a tower crane.
  • A Kodifly fixed-point LiDAR unit in front of public housing blocks and tower cranes under construction
    Fixed-point LiDAR facing residential blocks under construction.
  • A Kodifly LiDAR unit and equipment cabinet on a pole above a protected hillside, with technicians at work
    LiDAR unit and equipment cabinet on a pole at a public works site.
  • A Kodifly LiDAR unit on a pole beside a flyover and a public housing estate
    LiDAR unit on a pole beside a flyover and a housing estate.

ScanStation questions

Is ScanStation part of the DWSS?

No. A Digital Works Supervision System under TC(W) No. 8/2025 is delivered by SpatialSense alone. ScanStation is for site capture under the Co-supervision Platform, TC(W) No. 1/2026.

What does fixed-point capture mean?

The LiDAR stays in one place, on a pole, tower crane or other non-movable object, and observes the same area repeatedly. Comparing scans over time gives the 4D point-cloud video described in the circular.

Where can I get the full datasheet?

Ask us through the contact page and we will send it.

Plan ScanStation placement for your site.

Tell us the site and the works type. We will advise where fixed-point units and drone routes should cover.