Smart Construction
Management Solutions
Smart Construction
Management Solutions
The construction site is complex, and errors are expensive. Kodifly uses LiDAR hardware and AI software to create a live 3D "Digital Twin" of your project. We automate progress tracking and catch design-to-site discrepancies early, helping you eliminate costly rework and keep your project on schedule and under budget.
The construction site is complex, and errors are expensive. Kodifly uses LiDAR hardware and AI software to create a live 3D "Digital Twin" of your project. We automate progress tracking and catch design-to-site discrepancies early, helping you eliminate costly rework and keep your project on schedule and under budget.

Challenges
What makes Construction Industry challenging?
Inefficient Progress Tracking
Relying on manual site walks and paper reports is slow. By the time a manager notices a delay or a mistake, days have passed. The Result: Slow decision-making that leads to project overruns and missed deadlines
Inefficient Progress Tracking
Relying on manual site walks and paper reports is slow. By the time a manager notices a delay or a mistake, days have passed. The Result: Slow decision-making that leads to project overruns and missed deadlines
Inefficient Progress Tracking
Relying on manual site walks and paper reports is slow. By the time a manager notices a delay or a mistake, days have passed. The Result: Slow decision-making that leads to project overruns and missed deadlines
Manual Collection & Detection
Manually measuring sites or checking if a measurement is correct takes huge effort and is prone to rework, increasing cost, delaying timelines, and hurting productivity.
Manual Detection
Manually measuring sites or checking if a measurement is correct takes huge effort and is prone to rework, increasing cost, delaying timelines, and hurting productivity.
Manual Collection & Detection
Manually measuring sites or checking if a measurement is correct takes huge effort and is prone to rework, increasing cost, delaying timelines, and hurting productivity.
Fragmented Site Data
Information is often scattered across different photos, emails, and drawings that don't talk to each other. The Result: Teams are "flying blind," leading to miscommunication and confusion about where things actually stand.
Fragmented Site Data
Site information is trapped in disconnected formats. Progress is hidden across scattered PDFs , site photos, CSVs,PCDs and various other files that don't talk to each other.
Fragmented Site Data
Information is often scattered across different photos, emails, and drawings that don't talk to each other. The Result: Teams are "flying blind," leading to miscommunication and confusion about where things actually stand.
Solutions
How Kodifly Benefits Construction Industry
How Kodifly Benefits
Construction Industry
Kodifly’s Construction Management Solutions centralizes site visibility, progress tracking, and asset monitoring into one intelligent system, ensuring every project stays on schedule, within budget, and compliant with safety standards.
MiC Progress Tracking
For Modular Integrated Construction, precision is everything. We track each module from delivery to installation, ensuring that every unit is aligned perfectly with the structural design.

MiC Progress Tracking
For Modular Integrated Construction, precision is everything. We track each module from delivery to installation, ensuring that every unit is aligned perfectly with the structural design.

MiC Progress Tracking
For Modular Integrated Construction, precision is everything. We track each module from delivery to installation, ensuring that every unit is aligned perfectly with the structural design.

Traffic Congestion Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

Traffic Congestion Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

Traffic Congestion Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

Slope Monitoring & Calculation
Manual surveys for site formation are slow and dangerous. Kodifly uses LiDAR to automatically calculate excavation volumes and monitor slope stability. Our system detects shifts in real-time, providing early warnings to prevent structural collapses and ensure site safety.

Slope Monitoring & Calculation
Manual surveys for site formation are slow and dangerous. Kodifly uses LiDAR to automatically calculate excavation volumes and monitor slope stability. Our system detects shifts in real-time, providing early warnings to prevent structural collapses and ensure site safety.

Slope Monitoring & Calculation
Manual surveys for site formation are slow and dangerous. Kodifly uses LiDAR to automatically calculate excavation volumes and monitor slope stability. Our system detects shifts in real-time, providing early warnings to prevent structural collapses and ensure site safety.

Tower Crane Utilization Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

Tower Crane Utilization Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

Tower Crane Utilization Monitoring
During construction, heavy machinery and material deliveries frequently obstruct public roads, creating traffic bottlenecks and disruptions for the local community. Kodifly monitors site access points in real-time to detect these blockages and alert managers instantly. This keeps roads clear and helps companies stay compliant, avoiding community complaints and expensive legal fines.

AI-Driven Construction Monitoring Solution
Capture live site data and turn it into actionable decisions for safety, efficiency, and project control
Capture live site data and turn it into actionable decisions for safety, efficiency, and project control
Kodifly’s Construction Management Solutions centralizes site visibility, progress tracking, and asset monitoring into one intelligent system. By combining LiDAR, IoT sensors, and AI analytics, we enable real-time oversight of construction activities, ensuring every project stays on schedule, within budget, and compliant with safety standards.
End-to-End Visibility
Fixed, aerial, and handheld LiDAR give you continuous 3D coverage of every stage of construction.
End-to-End Visibility
Fixed, aerial, and handheld LiDAR give you continuous 3D coverage of every stage of construction.
Cost & Risk Reduction
Detect issues early to cut rework and compliance costs by 35–45%.
Cost & Risk Reduction
Detect issues early to cut rework and compliance costs by 35–45%.
Compliance & Accountability
Timestamped BIM records ensure transparent, dispute-free contracting.
Compliance & Accountability
Timestamped BIM records ensure transparent, dispute-free contracting.
Automated Oversight
Replace manual checks with 24/7 AI-powered tracking for progress, safety, and deviations.
Automated Oversight
Replace manual checks with 24/7 AI-powered tracking for progress, safety, and deviations.
Scalable & Integrated
Supports integration with BIM, IoT, and Kodifly’s SpatialSense analytics platform.
Scalable & Integrated
Supports integration with BIM, IoT, and Kodifly’s SpatialSense analytics platform.
Our Hardwares
Engineered for Smart Construction

Fixed Point LiDAR
Deploy once with minimal maintenance, and scale seamlessly from single-site monitoring to multi-site operations
LiDAR
Fixed Point LiDAR
190m range, 20mm Accuracy
Camera
10MP Global Shutter
HDR Support
IMU/GNSS
RTK Enabled
6-Axis IMU
Power
24v DC Input
UPS Backup
Enclosure
IP65 Rate
Stainless Steel
Installation
Pole/Wall Mount
Minimal Maintenance

Spatial Scanner
Lightweight and quick to deploy, this handheld device captures real- time 3D data, deal for indoor, underground, or GPS-denied spaces.
LiDAR
200.000 pts/s
Livox Mid-360
Camera
180° FoV @20FPS
Intel D435i
IMU/GNSS
T-RTK UM982 Mobile
Multi-axis IMU
Power
Magazine Battery
88.8 Wh, 3-5 h runtime
Storage
256 GB
Expandable via Card
Computer Unit
Intel N5095
4-core 2.0Ghz, 4MB cache

Aerial Drone
Built for high-speed, high-precision mapping of urban infrastructure. Vehicle-mounted and equipped with advanced LiDAR, high-definition cameras, and GNSS/IMU positioning
LiDAR
240,000 pts/s
450m range, ±2cm Accuracy
Camera
142° FOV Camera
1080p @30FPS
IMU/GNSS
RTK Enabled
6- Directional Positioning
Power
5880 mAh Li-ion
1.3kg, 44.76 V
Enclosure
IP55 Rate
Dust-Safe, Water-Resistant
Integration
Powerful Payloads
Multi Payloads Support
Rugged. Reliable. Ready for the field.
Engineered for Smart Construction

Fixed Point LiDAR
Deploy once with minimal maintenance, and scale seamlessly from single-site monitoring to multi-site operations
LiDAR
Fixed Point LiDAR
190m range, 20mm Accuracy
Camera
10MP Global Shutter
HDR Support
IMU/GNSS
RTK Enabled
6-Axis IMU
Power
24v DC Input
UPS Backup
Enclosure
IP65 Rate
Stainless Steel
Installation
Pole/Wall Mount
Minimal Maintenance

Spatial Scanner
Lightweight and quick to deploy, this handheld device captures real- time 3D data, deal for indoor, underground, or GPS-denied spaces.
LiDAR
200.000 pts/s
Livox Mid-360
Camera
180° FoV @20FPS
Intel D435i
IMU/GNSS
T-RTK UM982 Mobile
Multi-axis IMU
Power
Magazine Battery
88.8 Wh, 3-5 h runtime
Storage
256 GB
Expandable via Card
Computer Unit
Intel N5095
4-core 2.0Ghz, 4MB cache

Aerial Drone
Built for high-speed, high-precision mapping of urban infrastructure. Vehicle-mounted and equipped with advanced LiDAR, high-definition cameras, and GNSS/IMU positioning
LiDAR
240,000 pts/s
450m range, ±2cm Accuracy
Camera
142° FOV Camera
1080p @30FPS
IMU/GNSS
RTK Enabled
6- Directional Positioning
Power
5880 mAh Li-ion
1.3kg, 44.76 V
Enclosure
IP55 Rate
Dust-Safe, Water-Resistant
Integration
Powerful Payloads
Multi Payloads Support
Rugged. Reliable. Ready for the field.
Engineered for Smart Construction

Fixed Point LiDAR
Deploy once with minimal maintenance, and scale seamlessly from single-site monitoring to multi-site operations
LiDAR
Fixed Point LiDAR
190m range, 20mm Accuracy
Camera
10MP Global Shutter
HDR Support
IMU/GNSS
RTK Enabled
6-Axis IMU
Power
24v DC Input
UPS Backup
Enclosure
IP65 Rate
Stainless Steel
Installation
Pole/Wall Mount
Minimal Maintenance

Spatial Scanner
Lightweight and quick to deploy, this handheld device captures real- time 3D data, deal for indoor, underground, or GPS-denied spaces.
LiDAR
200.000 pts/s
Livox Mid-360
Camera
180° FoV @20FPS
Intel D435i
IMU/GNSS
T-RTK UM982 Mobile
Multi-axis IMU
Power
Magazine Battery
88.8 Wh, 3-5 h runtime
Storage
256 GB
Expandable via Card
Computer Unit
Intel N5095
4-core 2.0Ghz, 4MB cache

Aerial Drone
Built for high-speed, high-precision mapping of urban infrastructure. Vehicle-mounted and equipped with advanced LiDAR, high-definition cameras, and GNSS/IMU positioning
LiDAR
240,000 pts/s
450m range, ±2cm Accuracy
Camera
142° FOV Camera
1080p @30FPS
IMU/GNSS
RTK Enabled
6- Directional Positioning
Power
5880 mAh Li-ion
1.3kg, 44.76 V
Enclosure
IP55 Rate
Dust-Safe, Water-Resistant
Integration
Powerful Payloads
Multi Payloads Support
Construction Management Platform
SpatialSense Build
SpatialSense transforms infrastructure management by centralizing asset data, digital twins, and project collaboration into one cloud-based platform
Discover features designed to simplify workflows, boost productivity, and improve team collaboration seamlessly.
Kodifly’s SpatialSense Platform integrates LiDAR, imaging, and geospatial data to create a living, interactive model of your entire railway infrastructure. Operators can visualize conditions, analyze historical data, and make data-driven decisions on maintenance, safety, and performance, all from a single interface.





Transform the Way You Build
Bring automation, accuracy, and safety to every construction project from excavation to handover.
Transform the Way You Build
Bring automation, accuracy, and safety to every construction project from excavation to handover.