Road Scanning & Monitoring Solutions

Road Scanning & Monitoring Solutions

Road Scanning & Monitoring Solutions

Managing road health and roadside assets is complex. Aging roads, heavy traffic, and weather damage make inspections slow and costly. Kodifly uses AI powered scanning and real time monitoring to turn road data into clear insights for safer, smarter maintenance.

Managing road health and roadside assets is complex. Aging roads, heavy traffic, and weather damage make inspections slow and costly. Kodifly uses AI powered scanning and real time monitoring to turn road data into clear insights for safer, smarter maintenance.

Challenges

What makes Road Infrastructure challenging?

Ageing Infrastructure, Limited Insight

Manual inspections miss cracks, potholes, & fading markings leading to costly, delayed repairs

Ageing Infrastructure, Limited Insight

Manual inspections miss cracks, potholes, & fading markings leading to costly, delayed repairs

Ageing Infrastructure, Limited Insight

Manual inspections miss cracks, potholes, & fading markings leading to costly, delayed repairs

Urban Growth & Climate Pressure

Rising traffic, floods, and encroachments demand continuous, automated monitoring

Urban Growth & Climate Pressure

Rising traffic, floods, and encroachments demand continuous, automated monitoring

Manual Detection

Rising traffic, floods, and encroachments demand continuous, automated monitoring

Disconnected Data, Slow Action

Traditional surveys create reporting gaps; decisions take weeks instead of days

Disconnected Data, Slow Action

Traditional surveys create reporting gaps; decisions take weeks instead of days

Disconnected Data, Slow Action

Traditional surveys create reporting gaps; decisions take weeks instead of days

Solutions

How Kodifly Benefits Road Industry

How Kodifly Benefits
Construction Industry

End-to-End Road Scanning and Asset Monitoring

Roadside Asset Mangement

Automate roadside infrastructure monitoring by using AI to detect, classify, and track assets. The system identifies missing, moved, or damaged objects between updates and generates reports to streamline maintenance and ensure inventory accuracy.

Roadside Asset Mangement

Automate roadside infrastructure monitoring by using AI to detect, classify, and track assets. The system identifies missing, moved, or damaged objects between updates and generates reports to streamline maintenance and ensure inventory accuracy.

Roadside Asset Mangement

Automate roadside infrastructure monitoring by using AI to detect, classify, and track assets. The system identifies missing, moved, or damaged objects between updates and generates reports to streamline maintenance and ensure inventory accuracy.

Road Condition Analysis

Automate road maintenance by using AI to detect surface defects like cracks and potholes while inventorying assets such as manholes and curbs. The system calculates condition scores and identifies hazards to prioritize repairs and optimize maintenance budgets.

Road Condition Analysis

Automate road maintenance by using AI to detect surface defects like cracks and potholes while inventorying assets such as manholes and curbs. The system calculates condition scores and identifies hazards to prioritize repairs and optimize maintenance budgets.

Road Condition Analysis

Automate road maintenance by using AI to detect surface defects like cracks and potholes while inventorying assets such as manholes and curbs. The system calculates condition scores and identifies hazards to prioritize repairs and optimize maintenance budgets.

Road Intrusion & Safety

Boost highway and tunnel safety by instantly detecting intrusions, traffic violations, and PPE non-compliance. The system identifies real-time anomalies to prevent accidents, ensure regulatory compliance, and maintain a smooth, secure traffic flow.

Road Intrusion & Safety

Boost highway and tunnel safety by instantly detecting intrusions, traffic violations, and PPE non-compliance. The system identifies real-time anomalies to prevent accidents, ensure regulatory compliance, and maintain a smooth, secure traffic flow.

Road Intrusion & Safety

Boost highway and tunnel safety by instantly detecting intrusions, traffic violations, and PPE non-compliance. The system identifies real-time anomalies to prevent accidents, ensure regulatory compliance, and maintain a smooth, secure traffic flow.

Management & Analytics Platform

Centralize roadside data into a unified platform that provides a single source of truth for asset health and road conditions. This solution transforms raw data into actionable insights through 3D digital twins, real-time alerts, and predictive analytics that forecast infrastructure degradation.

Management & Analytics Platform

Centralize roadside data into a unified platform that provides a single source of truth for asset health and road conditions. This solution transforms raw data into actionable insights through 3D digital twins, real-time alerts, and predictive analytics that forecast infrastructure degradation.

Management & Analytics Platform

Centralize roadside data into a unified platform that provides a single source of truth for asset health and road conditions. This solution transforms raw data into actionable insights through 3D digital twins, real-time alerts, and predictive analytics that forecast infrastructure degradation.

Revolutionizing Roads with AI-Powered Insights

Capture live site data and turn it into actionable decisions for safety and efficiency

Capture live site data and turn it into actionable decisions for safety and efficiency

Accurate & Scalable

High-resolution sensing at scale

Cost-Effective

Early detection reduces repair costs

Proven Track Record

Deployed across infrastructure sectors

Data-Driven Decisions

Analytics, dashboards, predictive insights

Seamless Integration

APIs, GIS compatibility, customizations

Hardware Spotlight

SS-360 Mobile Mapping System

SS-360 Mobile Mapping System

SpatialSense SS-360 MMS is Kodifly’s high-speed Mobile Mapping System built for urban and highway environments. Equipped with dual LiDAR sensors, six HD cameras, and an IMU/GNSS unit, it delivers dense, accurate maps even at speeds up to 70 km/h.

SpatialSense SS-360 MMS is Kodifly’s high-speed Mobile Mapping System built for urban and highway environments. Equipped with dual LiDAR sensors, six HD cameras, and an IMU/GNSS unit, it delivers dense, accurate maps even at speeds up to 70 km/h.

SS-360

SS-360

MMS

Road Infrastructure Platform

SpatialSense Road

A unified platform for 3D mapping and AI-powered road assessment, detecting defects, assets, and changes in real time

Discover features designed to simplify workflows, boost productivity, and improve team collaboration seamlessly.

Kodifly’s SpatialSense Platform integrates LiDAR, imaging, and geospatial data to create a living, interactive model of your entire railway infrastructure. Operators can visualize conditions, analyze historical data, and make data-driven decisions on maintenance, safety, and performance, all from a single interface.

Dashboard Image

Safer, Smarter Roads

Transform road maintenance with real-time intelligence.

Safer, Smarter Roads

Transform road maintenance with real-time intelligence.

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Stay up to date

Get the latest updates and exclusive tips to boost your sales

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Stay up to date

Get the latest updates and exclusive tips to boost your sales

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions