Fixed Point LiDAR System

Fixed Point LiDAR System

Fixed Point LiDAR System

Fixed-position LiDAR system for capturing every milestone
for transparent construction management

Fixed-position LiDAR system for capturing every milestone for transparent construction management

Fixed-position LiDAR system for capturing every milestone for transparent construction management

Versatile. Precise. Efficient.

Smart Capture for Smarter Construction

Fixed Point LiDAR Scanner is built for smart construction. It combines LiDAR, camera and RTK to deliver accurate 3D data from every angle of your site.

High Range
LiDAR Sensor

Robust Body

Stable mounting
on any surface.

Precise 

Geo-Referencing via GNSS

Key Features

Multi Sensor

Scanning

Microsecond Synchronization

Geo-referenced
Point Clouds

Large-Scene

Coverage

High-Precision

Scanning

Mountable on any Surface

Multi-Format

Export

SDK

Support

Proven Impact. Real Results

Hardware Capabilities

Hardware Capabilities

all-in-one industrial solution engineered for transparent construction management. By integrating high-speed LiDAR, a global-shutter HD camera, and RTK-enabled GNSS, the system captures every milestone with centimeter-level precision.

200k

Points Per Second

200k

Points Per Second

200k

Points Per Second

150°

Angular Coverage

150°

Angular Coverage

150°

Angular Coverage

380m

Maximum Deteciton Range

380m

Maximum Deteciton Range

380m

Maximum Deteciton Range

6cm

Range Precision

6cm

Range Precision

6cm

Range Precision

all-in-one industrial solution engineered for transparent construction management. By integrating high-speed LiDAR, a global-shutter HD camera, and RTK-enabled GNSS, the system captures every milestone with centimeter-level precision.

all-in-one industrial solution engineered for transparent construction management. By integrating high-speed LiDAR, a global-shutter HD camera, and RTK-enabled GNSS, the system captures every milestone with centimeter-level precision.

How does it work?

How does it work?

How does it work?

Deploy. Capture. Analyze.

Deploy. Capture. Analyze.

Deploy. Capture. Analyze.

Scan

Capture the environment quickly with GeoScan S1.

Scan

Capture the environment quickly with GeoScan S1.

Application Usecases

See how our tech captures, processes, and transforms your construction site into actionable data

Modular Integrated Construction

Modular Integrated Construction

Excavation Monitoring

Road Infrastructure Mapping

Excavation Monitoring

Site Formation Monitoring

Site Formation Monitoring

Ready to Build Smarter

Ready to Build Smarter

Discover how real-time data can transform your construction site.

Discover how real-time data can transform your construction site.

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Stay up to date

Get the latest updates and exclusive tips to boost your sales

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions

We automate inspection and Quality Assurance of assets throughout infrastructure lifecycle.

Follow Us

Stay up to date

Get the latest updates and exclusive tips to boost your sales

Contact Us

info@kodifly.com

HK

Unit 327, Building 19W, No. 19 Science Park West Avenue, Hong Kong Science Park

SA

King Abdullah University of Science and Technology, Thuwal, Saudi Arabia

PK

Office 101-104, CEMTECH (NUST AI Tower), NSTP, NUST, Scholars Avenue, Sector H-12, Islamabad, Pakistan

SG

160 Robinson Road, #14-04 Singapore Business Federation Center

© Copyright 2025 Kodifly, All rights reserved.

Terms & Conditions