Spatial Sense Edge Device
SE-64

Spatial Sense Edge Device
SE-64

Spatial Sense Edge Device
SE-64

Real-time data collection and analysis for safer, smarter environments.

Real-time data collection and analysis for safer, smarter environments.

Real-time data collection and analysis for safer, smarter environments.

The SpatialSense Edge (SE-64) is a high-performance device designed for real-time data handling in the field. Featuring advanced processing capabilities and 5G connectivity, it ensures seamless operation and low-latency communication.

The SpatialSense Edge (SE-64) is a high-performance device designed for real-time data handling in the field. Featuring advanced processing capabilities and 5G connectivity, it ensures seamless operation and low-latency communication.

The SpatialSense Edge (SE-64) is a high-performance device designed for real-time data handling in the field. Featuring advanced processing capabilities and 5G connectivity, it ensures seamless operation and low-latency communication.

Product Highlights

Product Highlights

Product Highlights

Understanding the Mechanics Behind Our Technology

Understanding the Mechanics Behind Our Technology

Understanding the Mechanics Behind Our Technology

The core of SpatialSense Edge lies in its seamless integration of advanced hardware and intelligent software, transforming raw data into actionable insights. This section explores the three essential processes that drive the power and precision of our technology.

The core of SpatialSense Edge lies in its seamless integration of advanced hardware and intelligent software, transforming raw data into actionable insights. This section explores the three essential processes that drive the power and precision of our technology.

The core of SpatialSense Edge lies in its seamless integration of advanced hardware and intelligent software, transforming raw data into actionable insights. This section explores the three essential processes that drive the power and precision of our technology.

Scanning

Our state-of-the-art sensors are engineered for versatility, performing seamlessly across diverse environments, from busy airports to isolated construction sites.

Data Analysis

Once the data is captured, it undergoes rigorous analysis through our proprietary algorithms.

Actionable Insights

The final step involves translating raw data into intuitive insights accessible through our user-friendly SaaS platform.



Use Cases

Use Cases

Industrial Applications

Evaluating the effect of our solutions in the field of industry

Scanning

Scanning

Our state-of-the-art sensors are engineered for versatility, performing seamlessly across diverse environments, from busy airports to isolated construction sites.

Our state-of-the-art sensors are engineered for versatility, performing seamlessly across diverse environments, from busy airports to isolated construction sites.

Data Analysis

Data Analysis

Once the data is captured, it undergoes rigorous analysis through our proprietary algorithms.

Once the data is captured, it undergoes rigorous analysis through our proprietary algorithms.

Actionable Insights

Actionable Insights

The final step involves translating raw data into intuitive insights accessible through our user-friendly SaaS platform.

The final step involves translating raw data into intuitive insights accessible through our user-friendly SaaS platform.

Use Cases

Use Cases

Industrial Applications

Industrial Applications

Evaluating the effect of our solutions in the field of industry

Tech Specs

Tech Specs

Tech Specs

SE-64 Spatial Sense Edge

SE-64 Spatial Sense Edge

SE-64 Spatial Sense Edge

Integrates advanced processing capabilities with data from LiDAR sensors and high-resolution cameras to deliver real-time, 3D imaging of infrastructure environments.

Integrates advanced processing capabilities with data from LiDAR sensors and high-resolution cameras to deliver real-time, 3D imaging of infrastructure environments.

Processing Power

Processing Power

Processing Power

Memory

Memory

Memory

64Gb LPDDR5, 256-bit, 204.8 GB/s

64Gb LPDDR5, 256-bit, 204.8 GB/s

64Gb LPDDR5, 256-bit, 204.8 GB/s

CPU

CPU

CPU

8 cores, 2 Cortex-A78AE clusters (4 cores each), 2.2 GHz

8 cores, 2 Cortex-A78AE clusters (4 cores each), 2.2 GHz

8 cores, 2 Cortex-A78AE clusters (4 cores each), 2.2 GHz

CUDA Core

CUDA Core

CUDA Core

1792

1792

1792

Tensor Cores

Tensor Cores

Tensor Cores

56

56

56

Sparse TOPS

Sparse TOPS

Sparse TOPS

108 (939 MHz), 200 INT8 Sparse TOPS

108 (939 MHz), 200 INT8 Sparse TOPS

108 (939 MHz), 200 INT8 Sparse TOPS

NVDLA Engines

NVDLA Engines

NVDLA Engines

2 x v2.0, 1.4 GHz, 46 TOPS each

2 x v2.0, 1.4 GHz, 46 TOPS each

2 x v2.0, 1.4 GHz, 46 TOPS each

Video Capabilities

Video Capabilities

Video Capabilities

Video Encode

Video Encode

Video Encode

2 x 4K60, 4 x 4K30, 8 x 1080p60 (H.265)

2 x 4K60, 4 x 4K30, 8 x 1080p60 (H.265)

2 x 4K60, 4 x 4K30, 8 x 1080p60 (H.265)

Video Decode

Video Decode

Video Decode

1 x 8K30, 3 x 4K60, 6 x 4K30, 12 x 1080p60 (H.265)

1 x 8K30, 3 x 4K60, 6 x 4K30, 12 x 1080p60 (H.265)

1 x 8K30, 3 x 4K60, 6 x 4K30, 12 x 1080p60 (H.265)

Software Support

Software Support

Software Support

APIs

APIs

APIs

OpenGL 4.6+, OpenGL ES 3.2, Vulkan 1.2+, CUDA 10.2+

OpenGL 4.6+, OpenGL ES 3.2, Vulkan 1.2+, CUDA 10.2+

OpenGL 4.6+, OpenGL ES 3.2, Vulkan 1.2+, CUDA 10.2+

Jetpack

Jetpack

Jetpack

NVIDIA® JetPack 5.1.1

NVIDIA® JetPack 5.1.1

NVIDIA® JetPack 5.1.1

Storage

Storage

Storage

Flash Storage

Flash Storage

Flash Storage

64GB eMMC 5.1, 200 MHz

64GB eMMC 5.1, 200 MHz

64GB eMMC 5.1, 200 MHz

SD Card Slot

SD Card Slot

SD Card Slot

1 x SDXC-I/UHS-I

1 x SDXC-I/UHS-I

1 x SDXC-I/UHS-I

M.2 Slot

M.2 Slot

M.2 Slot

1 x 2280 Key M (PCIe 4.0 x4), NVMe SSD

1 x 2280 Key M (PCIe 4.0 x4), NVMe SSD

1 x 2280 Key M (PCIe 4.0 x4), NVMe SSD

Expansion

Expansion

Expansion

mPCIe Socket

mPCIe Socket

mPCIe Socket

1 x full size (PCIe 4.0, USB 2.0)

1 x full size (PCIe 4.0, USB 2.0)

1 x full size (PCIe 4.0, USB 2.0)

M.2 Key B Socket

M.2 Key B Socket

M.2 Key B Socket

1 x (USB 3.2/2.0), 2 x Nano SIM slots

1 x (USB 3.2/2.0), 2 x Nano SIM slots

1 x (USB 3.2/2.0), 2 x Nano SIM slots

M.2 Key E Socket

M.2 Key E Socket

M.2 Key E Socket

1 x (PCIe 4.0, USB 2.0) for Wi-Fi 5/6

1 x (PCIe 4.0, USB 2.0) for Wi-Fi 5/6

1 x (PCIe 4.0, USB 2.0) for Wi-Fi 5/6

Display

Display

Display

HDMI Output

HDMI Output

HDMI Output

1 x HDMI 2.0A/B, up to 3840 x 2160@60Hz

1 x HDMI 2.0A/B, up to 3840 x 2160@60Hz

1 x HDMI 2.0A/B, up to 3840 x 2160@60Hz

G- Sensors

G- Sensors

G- Sensors

Sensor

Sensor

Sensor

3D accelerometer and gyroscope (ST LSM6DSLTR)

3D accelerometer and gyroscope (ST LSM6DSLTR)

3D accelerometer and gyroscope (ST LSM6DSLTR)

Product Information Hub

Product Information Hub

Frequently Asked Questions

Frequently Asked Questions

Frequently Asked Questions

What is the technology behind SpatialSense?
Is a specific processing device required for the scanner?
How robust is the SpatialSense hardware?
Are there any specific installation requirements for SpatialSense?
What data can I get from SpatialSense?

Schedule a Meeting With Our Sales Team

Find out how SpatialSense can help transform your business.

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center 🇸🇬

🇭🇰

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue,

HKSTP, Pak Shek Kok

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center 🇸🇬

🇭🇰

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue,

HKSTP, Pak Shek Kok

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center 🇸🇬

🇭🇰

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue,HKSTP, Pak Shek Kok

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms