TRACKVISION

Advanced Clearance Solution for Safer and Reliable Rail Operations

TRACKVISION

Advanced Clearance Solution for Safer and Reliable Rail Operations

TrackVision is a system designed for detection and identification of objects on the railway tracks during traffic hour operations.

The system can be installed on locomotives, light rail, heavy rail vehicles operating in the depots/light rail network/heavy rail line.

The system helps maintenance teams to reduce inspection hours, increase safety and longevity of the railway assets.

TrackVision is a system designed for detection and identification of objects on the railway tracks during traffic hour operations.


The system can be installed on locomotives, light rail, heavy rail vehicles operating in the depots/light rail network/heavy rail line.


The system helps maintenance teams to reduce inspection hours, increase safety and longevity of the railway assets.

At a Glance

Clearance Intrusion Detection


Foreign Object on Track


Remaining Distance Alert

Clearance Intrusion Detection


Foreign Object on Track


Remaining Distance Alert

At a Glance

Tree Intrusion into Train's KE


Risk Level Analysis

Tree Growth Monitoring

Problem

Replacing Manual and Inefficient Inspections with Automated, Up-to-date Spatial and Video Information

Track clearance management is essential for railway safety but faces significant challenges. Traditional assessment methods, relying on 2D static drawings, are labor-intensive and prone to misinterpretation.


As rolling stock sizes increase and speeds rise, the risk of clearance infringements escalates, potentially leading to accidents and delays. Accurately predicting the dynamic kinematic envelope under various operational conditions complicates this further.

Without advanced modeling techniques, identifying clearance conflicts becomes time-consuming, impeding timely decision-making and project timelines.

How to Get Started With TrackVision?

Three Steps to Enhance your Railway Clearance Management

Step 01

Install the Scanner

Install the Scanner

Quickly mount the Spatial Sense Scanner on a railway vehicle to map and monitor corridors with precision. The kit includes all tools, hardware, and a user guide for easy setup and high-accuracy data collection.

Quickly mount the Spatial Sense Scanner on a railway vehicle to map and monitor corridors with precision. The kit includes all tools, hardware, and a user guide for easy setup and high-accuracy data collection.

Step 02

Scan Real-Time
3D Models

Scan Real-Time
3D Models

Once mounted, the Spatial Sense Scanner captures real-time 3D point cloud data, delivering precise and comprehensive mapping of railway corridors for monitoring and analysis.

Once mounted, the Spatial Sense Scanner captures real-time 3D point cloud data, delivering precise and comprehensive mapping of railway corridors for monitoring and analysis.

Learn More

Step 03

Actionable Alert Generation

Actionable Alert Generation

After scanning, the Spatial Sense Scanner analyzes data to detect objects intruding the clearance of rolling stock. Alerts are generated automatically for each instance, enabling proactive maintenance and ensuring safe operations.

After scanning, the Spatial Sense Scanner analyzes data to detect objects intruding the clearance of rolling stock. Alerts are generated automatically for each instance, enabling proactive maintenance and ensuring safe operations.

Want More Details? Download Our Leaflet.

Looking for more information? Get our detailed guide.

TreeGuard Solution

Advanced Monitoring for Safer Rail Operations

Advanced Monitoring for Safer Rail Operations

Get instantly notified about clearance intrusions

Get instantly notified about clearance intrusions

Have remote site visits with railway section data updated daily

Have remote site visits with railway section data updated daily

Get comprehensive measurements of trackside assets

Get comprehensive measurements of trackside assets

Create and export work orders and maintenance reports for on-ground staff

Create and export work orders and maintenance reports for on-ground staff

Want More Details? Download Our Leaflet.

Want More Details? Download Our Leaflet.

Impact

Why Choose TrackVision?

Faster

50%

Inspection process

Reduced

70%

Operational risks

Higher

95%

Accuracy in results

Comparison

TrackVision vs. Traditional Clearance Inspection

Seamless Data Automation

Seamless Data Automation

Seamless Data Automation

Dynamic Spatial Mapping

Dynamic Spatial Mapping

Dynamic Spatial Mapping

Precision Object Recognition

Precision Object Recognition

Precision Object Recognition

Predictive Maintenance Insights

Predictive Maintenance Insights

Predictive Maintenance Insights

Simplified Data Sharing

Simplified Data Sharing

Simplified Data Sharing

Enhanced Safety Measures

Enhanced Safety Measures

Enhanced Safety Measures

Kodifly's TrackVision System

Kodifly's TrackVision System

Kodifly's TrackVision System

Traditional Clearance Inspection

Traditional Clearance Inspection

Traditional Clearance Inspection

Our Solutions

Explore Our Cutting-Edge Solutions

Schedule a Meeting With Our Sales Team

Find out how SpatialSense can help transform your business.

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center 🇸🇬

🇭🇰

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue,

HKSTP, Pak Shek Kok

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms

Sign up to our newsletter

Stay updated with the latest solutions, insights, and exclusive content—delivered straight to your inbox.

Kodifly optimizes infrastructure using spatial intelligence and digital twins.

Follow Us

CONTACT US

info@kodifly.com

🇸🇬

160 Robinson Road, #14-04 Singapore Business Federation Center 🇸🇬

🇭🇰

Unit 661, 6/F, Building 19W, No. 19 Science Park West Avenue,HKSTP, Pak Shek Kok

🇵🇰

Unit 1204, NSTP building, Khyber road, NUST, H-12, Islamabad

© 2025 Kodifly Limited. All Rights reserved

Privacy & Policy

Cookies

Terms